{"id":848,"date":"2023-12-18T15:16:59","date_gmt":"2023-12-18T07:16:59","guid":{"rendered":"https:\/\/www.britecelectric.com\/?post_type=blog&#038;p=848"},"modified":"2024-09-05T16:39:56","modified_gmt":"2024-09-05T08:39:56","slug":"protection-measures-of-inductive-lightning-in-spc-exchange","status":"publish","type":"blog","link":"https:\/\/www.britecelectric.com\/pl\/blog\/protection-measures-of-inductive-lightning-in-spc-exchange\/","title":{"rendered":"\u015arodki ochrony przed piorunami indukcyjnymi w wymianie SPC"},"content":{"rendered":"Power communication is an indispensable and important part of modern power system and one of the three pillars for the safe and stable operation of modern power grid. SPC Exchange is an important part of power communication network. Once a fault occurs, the loss caused is not only economical. On the other hand, what is more serious is the potential threat to the grid security. Therefore, it is particularly important to strengthen the security protection of the SPC Exchange.\r\n\r\nNow many units have installed SPC Exchange, and the main component of the SPC Exchange is the integrated circuit (IC). The IC\u2019s anti-interference ability is relatively low, and even the lightning electromagnetic pulse (LEMP) induced from the line can break down the IC components. Therefore, the SPC Exchange is prone to lightning accidents. The damaged parts are mostly relay boards, user boards, billing cards and power supply parts. Due to the high value of these motherboards, in order to reduce economic losses, some users have tried various methods to protect the switch, and even insured the switch with an insurance company, but the loss caused by the interruption of communication caused by lightning strikes is irreparable. Therefore, the lightning protection of the SPC Exchange is particularly important.\r\n\r\n<strong>Po\u0142\u0105czenie ekwipotencjalne wy\u0142\u0105cznika<\/strong>\r\n\r\nCelem ekwipotencjalnego po\u0142\u0105czenia wy\u0142\u0105cznika jest zmniejszenie r\u00f3\u017cnicy potencja\u0142\u00f3w pomi\u0119dzy r\u00f3\u017cnymi metalowymi elementami i instalacjami w przestrzeni, w kt\u00f3rej wymagana jest ochrona odgromowa.\r\n\r\n<strong>Jako\u015b\u0107 budowy obiekt\u00f3w odgromowych<\/strong>\r\n\r\nZgodnie z odpowiednimi przepisami GB50057-94, budynek SPC Exchange musi posiada\u0107 urz\u0105dzenia zabezpieczaj\u0105ce przed bezpo\u015brednim uderzeniem pioruna. Gdy wysoko\u015b\u0107 budynku przekracza 30 m (ochrona odgromowa typu 1), 45 m (ochrona odgromowa typu 2) i 60 m (ochrona odgromowa typu 3), du\u017ce obiekty metalowe takie jak balustrady, drzwi i okna na \u015bcianie zewn\u0119trznej o powy\u017cszej wysoko\u015bci nale\u017cy pod\u0142\u0105czy\u0107 do urz\u0105dzenia odgromowego. Ponadto rezystancja uziemienia piorunaurz\u0105dzenia zabezpieczaj\u0105ce powinny r\u00f3wnie\u017c spe\u0142nia\u0107 wymagania odpowiednich specyfikacji.\r\n\r\n<strong>Strefa ochrony odgromowej (LPZ) wewn\u0105trz budynku<\/strong>\r\n\r\nZgodnie z odpowiednimi postanowieniami normy IEC1312-1 budynek jest podzielony na 4 obszary: LPZOA, obiekty w tym obszarze mog\u0105 by\u0107 bezpo\u015brednio uderzone przez piorun; LPZOB, obiekty w tym obszarze nie mog\u0105 by\u0107 bezpo\u015brednio uderzone przez piorun, a pole elektromagnetyczne w tym obszarze nie jest os\u0142abione; LPZ1, obiekty w tym obszarze nie mog\u0105 by\u0107 bezpo\u015brednio uderzone przez piorun, a pole elektromagnetyczne w tym obszarze mo\u017ce os\u0142abn\u0105\u0107; LPZ2 jest kolejnym obszarem ochrony odgromowej. Zgodnie z powy\u017csz\u0105 zasad\u0105 podzia\u0142u na strefy, SPCCentral\u0119 nale\u017cy w miar\u0119 mo\u017cliwo\u015bci umie\u015bci\u0107 w obszarze LPZ2, aby ograniczy\u0107 wp\u0142yw piorunowego impulsu elektromagnetycznego na wy\u0142\u0105cznik.\r\n\r\n<strong>Lokalizacja pokoju SPC Exchange<\/strong>\r\n\r\nThe location of the SPC Exchange room should be determined in combination with the terrain location and other factors. For high-rise buildings, the general practice is to set the room in the space below the 4th floor and above the first floor. In humid areas, it is not advisable to set up the room on the first floor.\r\n\r\nIn modern communication systems, a well-designed lightning protection system is critical to the safe operation of equipment, not just for SPC Exchange. To ensure the secure operation of the entire communication network, you must strictly follow the principles of comprehensive lightning protection and plan lightning protection from all possible routes.","protected":false},"featured_media":849,"parent":0,"menu_order":153,"template":"","meta":{"_acf_changed":false},"blog_category":[8],"class_list":["post-848","blog","type-blog","status-publish","has-post-thumbnail","hentry","blog_category-company-news"],"acf":{"des":"Power communication is an indispensable and important part of modern power system and one of the three pillars for the safe and stable operation of modern power grid. SPC Exchange is an important part of power communication network.","txt":"Power communication is an indispensable and important part of modern power system and one of the three pillars for the safe and stable operation of modern power grid. SPC Exchange is an important part of power communication network. Once a fault occurs, the loss caused is not only economical. On the other hand, what is more serious is the potential threat to the grid security. Therefore, it is particularly important to strengthen the security protection of the SPC Exchange.\r\n\r\nNow many units have installed SPC Exchange, and the main component of the SPC Exchange is the integrated circuit (IC). The IC\u2019s anti-interference ability is relatively low, and even the lightning electromagnetic pulse (LEMP) induced from the line can break down the IC components. Therefore, the SPC Exchange is prone to lightning accidents. The damaged parts are mostly relay boards, user boards, billing cards and power supply parts. Due to the high value of these motherboards, in order to reduce economic losses, some users have tried various methods to protect the switch, and even insured the switch with an insurance company, but the loss caused by the interruption of communication caused by lightning strikes is irreparable. Therefore, the lightning protection of the SPC Exchange is particularly important.\r\n\r\n<strong>The equipotential connection of the switch<\/strong>\r\n\r\nThe purpose of equipotential connection of the switch is to reduce the potential difference between various metal components and systems in the space where lightning protection is required.\r\n\r\n<strong>The quality of building lightning protection facilities<\/strong>\r\n\r\nAccording to the relevant provisions of GB50057-94, the building of SPC Exchange must have facilities for preventing direct lightning strikes. When the height of the building exceeds 30m (type 1 lightning protection), 45m (type 2 lightning protection) and 60m (type 3 lightning protection), the large metal objects such as railings, doors and windows on the outer wall of the above height should be connected to the lightning protection device. In addition, the grounding resistance of lightning protection facilities should also meet the requirements of relevant specifications.\r\n\r\n<strong>The lightning protection zone (LPZ) inside the building<\/strong>\r\n\r\nAccording to the relevant provisions of IEC1312-1, the building is divided into 4 areas: LPZOA, objects in this area may be directly struck by lightning; LPZOB, objects in this area cannot be directly struck by lightning, and the electromagnetic field in the area is not attenuated; LPZ1, objects in this area cannot be directly struck by lightning, and the electromagnetic field in the area may attenuate; LPZ2 is the follow-up lightning protection area. According to the above zoning principle, SPC Exchange should be placed in the LPZ2 area as much as possible to reduce the impact of lightning electromagnetic pulse on the switch.\r\n\r\n<strong>The location of the SPC Exchange room<\/strong>\r\n\r\nThe location of the SPC Exchange room should be determined in combination with the terrain location and other factors. For high-rise buildings, the general practice is to set the room in the space below the 4th floor and above the first floor. In humid areas, it is not advisable to set up the room on the first floor.\r\n\r\nIn modern communication systems, a well-designed lightning protection system is critical to the safe operation of equipment, not just for SPC Exchange. To ensure the secure operation of the entire communication network, you must strictly follow the principles of comprehensive lightning protection and plan lightning protection from all possible routes."},"_links":{"self":[{"href":"https:\/\/www.britecelectric.com\/pl\/wp-json\/wp\/v2\/blog\/848","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.britecelectric.com\/pl\/wp-json\/wp\/v2\/blog"}],"about":[{"href":"https:\/\/www.britecelectric.com\/pl\/wp-json\/wp\/v2\/types\/blog"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.britecelectric.com\/pl\/wp-json\/wp\/v2\/media\/849"}],"wp:attachment":[{"href":"https:\/\/www.britecelectric.com\/pl\/wp-json\/wp\/v2\/media?parent=848"}],"wp:term":[{"taxonomy":"blog_category","embeddable":true,"href":"https:\/\/www.britecelectric.com\/pl\/wp-json\/wp\/v2\/blog_category?post=848"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}